Reconstruction of the state regional highway P85 Riga HPP - Jaunjelgava section with P88 Enkurnieki (km 40.20 - 48.80)

Subcontractor: SIA ”VIA”

Type of construction: reconstruction

Construction time: 10.2015. - 07.2016

Main works performed: dismantling works (asphalt concrete milling, dismantling of crushed stone foundations, dismantling of concrete edges); construction of a trench; construction of plastic culverts; concreting of concrete end walls for plastic culverts; construction of drainage collector; laying of geosynthetic materials; embankment construction; stepwise formation of the embankment with geesetic materials; frost-resistant layer construction; construction of rubble foundations; installation of concrete curbs; construction of concrete gutters, fixing of ditch gutters with concrete paving slabs; construction of suburbs; asphalt concrete pavement construction; improvement works (application of horizontal road markings, installation of road signs, installation of barriers, landscaping works), etc. works.