Reconstruction of the state regional highway P87 Bauska - Aizkraukle section km 61,200-63,360

Customer: SJSC “Latvijas Valsts ceļi”

Executor: SIA ”VIA”

Type of construction: reconstruction

Construction time: 04.2019. - 11.2019

Main works performed: dismantling of asphalt pavement with an average thickness of 8 cm; installation of culverts (with a diameter of 0.5m, 1.0m, 1.5m); construction of drainage system, (d = 160mm, d = 300mm); construction of rainwater collector; Construction of U-shaped concrete gutters 100x50x20 cm; U-shaped reinforced concrete gutter 100x100x20 cm; installation of concrete gutters 100x20x50 cm; digging ditches; embankment construction; construction of a trench; construction and dismantling of temporary corrugated walls; geotextile laying; laying of hydraulic geotextiles; geogrid laying; soil stabilization, at an average depth of 2 m; frost-resistant construction; construction of the base load-bearing sublayer and top layer of unbound mineral materials; edge filling, profiling and sealing; construction of hot asphalt AC22base substructure; construction of hot asphalt AC11surf pavement; installation of metal safety barriers; installation of a concrete safety barrier; application of horizontal road markings; strengthening of slopes, landscaping with plant land; reinforcement of slopes with polypropylene three-dimensional anti-corrosion mat, etc. works.

Share by: